CTPark Hustopeče

Hustopeče
Planned construction
Price on request
For lease
Minimum unit
2 000 m²
Available
39 797 m²
Into construction
39 797 m²
Ramps
Direct entrances
Sprinklers
Parking
The planned construction of three modern industrial halls with a total area of ​​39,797 sq m. The construction will be divided into two phases. The premises will be suitable for storage, distribution, logistics, and light production.
The building is located north of the town of Hustopeče. Highway D2 (Brno - Bratislava) exit 25 is 700 m away. Public transport (bus) is within walking distance.
The planned construction of three modern industrial halls with a total area of ​​39,797 sq m. The construction will be divided into two phases. The premises will be suitable for storage, distribution, logistics, and light production.