CTPark Hustopeče

Hustopeče
Planned
Price on request
Pronájem
Minimal area
2 000 m²
Total area
39 797 m²
Planned area
39 797 m²
Loading docks
Drivein gates
Sprinklers
The planned construction of three modern industrial halls with a total area of ​​39,797 sq m. The construction will be divided into two phases. The premises will be suitable for storage, distribution, logistics, and light production.
The building is located north of the town of Hustopeče. Highway D2 (Brno - Bratislava) exit 25 is 700 m away. Public transport (bus) is within walking distance.
The planned construction of three modern industrial halls with a total area of ​​39,797 sq m. The construction will be divided into two phases. The premises will be suitable for storage, distribution, logistics, and light production.