CTPark Chomutov

Chomutov
Existing premises
Price on request
For lease
Minimum unit
5 000 m²
Available
11 423 m²
Into construction
6 116 m²
Ramps
Direct entrances
Parking
Public transport
Upon completion, the area will consist of two industrial buildings with a total area of 27,000 sq m. One building is already existing, and the other is under construction. The new building is designed with a standard clear height of 10.5 m and will feature loading docks and drive-ins. There is ample parking on the premises. The premises are suitable for warehousing, logistics, distribution, or light production.
Next to highway junction (No. 82) where the D7 (Prague - Chomutov) highway meets the I13 national motorway, which runs parallel with the Czech-German border, connecting Karlovy Vary, Chomutov, Teplice and Liberec. There is a train station (Černovice u Chomutova) within a 5 minute walk from the Property, connecting to the main train station in Chomutov.
Upon completion, the area will consist of two industrial buildings with a total area of 27,000 sq m. One building is already existing, and the other is under construction. The new building is designed with a standard clear height of 10.5 m and will feature loading docks and drive-ins. There is ample parking on the premises. The premises are suitable for warehousing, logistics, distribution, or light production.