The park consists of one modern industrial hall completed in 2019. The building was constructed with a clear internal height of 10 m and floor load capacity of 5t/sqm.
The building is located 3.5 km east of Žiar nad Hronom.
Right next to exit 128 of the R1 expressway (Banská Bystrica - Trnava).
Public transport is in front of the park.