Planned construction of two modern industrial buildings with a total size of 32,330 sq m (8,281 sq m and 24,049 sq m). The buildings will be built with a clear height of 10.5 m and will have loading ramps and direct entrances.
The premises will be suitable for storage, logistics, and light production.
The complex is located near the village of Žebrák, halfway between Prague and Pilsen.
Highway D5 (Prague - Pilsen - Germany) exit 34 is right next to the complex.
Public transport is within walking distance.