BHM Park Dunajská Streda

Dunajská Streda
Existing premises
Price on request
Minimum unit
0 m²
Available
5 227 m²
Into construction
0 m²
The park consists of Class A industrial halls with a total area of 95,000 m² (formerly Log Center R7), directly at the R7 expressway south-east of Bratislava in the municipality of Kostolné Kračany. The existing park is fully occupied. Phase 2 is underway, delivering an additional 90,000 m² of modern logistics and industrial space with completion anticipated at the beginning of 2027. Located 5 km from the Metrans intermodal terminal and within one hour's drive of four major automotive plants. Available space (Phase 2): 1,000–75,000 m².
The park is located in the municipality of Kostolné Kračany, directly at the R7 expressway south-east of Bratislava. 40 km from Bratislava, 5 km from the Metrans intermodal terminal. 7.5 km from exit 32 on the R7 expressway, which provides direct connection to the D4 highway.
The park consists of Class A industrial halls with a total area of 95,000 m² (formerly Log Center R7), directly at the R7 expressway south-east of Bratislava in the municipality of Kostolné Kračany. The existing park is fully occupied. Phase 2 is underway, delivering an additional 90,000 m² of modern logistics and industrial space with completion anticipated at the beginning of 2027. Located 5 km from the Metrans intermodal terminal and within one hour's drive of four major automotive plants. Available space (Phase 2): 1,000–75,000 m².