CID Pardubice – Choteč

Pardubice - Choteč
Planned construction
Price on request
For lease, For sale
Minimum unit
1 000 m²
Available
4 500 m²
Into construction
4 500 m²
Ramps
Direct entrances
Parking
Small business units
Planned construction of a 4,500 sq m industrial warehouse. The building will feature loading docks and drive-in, as well as ample parking. The premises will be suitable for logistics, distribution, or light production. The building is available for both built-to-suit and built-to-own projects.
The project is planned for an undeveloped area near the village of Choteč, 6 km northeast of Pardubice. Exit 139 of the D35 highway (Úlibice–Lipník nad Bečvou) is only 2.8 km away. Public transportation (bus, train) is not within walking distance.
Planned construction of a 4,500 sq m industrial warehouse. The building will feature loading docks and drive-in, as well as ample parking. The premises will be suitable for logistics, distribution, or light production. The building is available for both built-to-suit and built-to-own projects.