DMC ValMez

Valašské Meziříčí
Under construction
Price on request
For lease
Minimum unit
0 m²
Available
28 094 m²
Into construction
39 244 m²
Ramps
Parking
Public transport
Planned construction of three modern industrial buildings. Construction will be carried out according to the tenant´s requirements. The smallest building is already pre-leased. Handover is possible 12-14 months after signing the contract.
The park is located in an industrial zone in the east of Valašské Meziříčí. The park is connected to the I/35 road. A bus stop and train station are both located within walking distance.
Planned construction of three modern industrial buildings. Construction will be carried out according to the tenant´s requirements. The smallest building is already pre-leased. Handover is possible 12-14 months after signing the contract.