Green Line Zone Mikulov

Mikulov
Planned construction
Price on request
For lease
Minimum unit
12 000 m²
Available
25 020 m²
Into construction
25 020 m²
Ramps
Public transport
Cross-dock
Planned construction of one industrial hall with a clear internal height of 10 m. The building may be divided into three units, each totalling approx. 8,300 sq m. The premises will be suitable for production, logistics or warehousing. Handover is possible 12-14 months after signing the contract.
The hall wiĺl be built in an industrial zone in the northwestern part of Mikulov. Directly by the I/52 road, which is connected to the Austrian B7 highway and the Czech D52 highway (Brno - Mikulov). A bus stop is located within walking distance.
Planned construction of one industrial hall with a clear internal height of 10 m. The building may be divided into three units, each totalling approx. 8,300 sq m. The premises will be suitable for production, logistics or warehousing. Handover is possible 12-14 months after signing the contract.