The planned construction of two modern industrial halls with a total size of 27,487 m2. The halls will have a clear height of 10 m, drive-in, and loading docks.
The premises will be suitable for warehousing and light production.
The complex is located in the northeast near the village of Zaječí, south of the town of Hustopeče.
Highway D2 (Brno-Bratislava) exit 25 is 10 km away.
Public transport is in the nearby village.