Garbe Park Chomutov II (Klášterec)

Chomutov
Existing
Price on request
Pronájem, Prodej
Minimal area
4 000 m²
Total area
53 993 m²
Planned area
53 993 m²
Public transport
Upon completion, the area will consist of two buildings with a total area of more than 70,000 sq m. The buildings are designed with a standard clear height of 10 m and will feature technical standards such as loading docks and drive-ins. One building has been completed, while the second building will be constructed for a specific tenant. The premises are suitable for warehousing, logistics, distribution, or light production.
The area is located in an industrial zone east of the town of Klášterec nad Ohří (Chomutov district). Directly on the E442 (I/13) road connecting Chomutov and Karlovy Vary. 13 km from exit no. 82 on the D7 motorway (Prague - Chomutov - Germany). The complex is accessible by public transport - there is a bus stop at the entrance to the complex.
Upon completion, the area will consist of two buildings with a total area of more than 70,000 sq m. The buildings are designed with a standard clear height of 10 m and will feature technical standards such as loading docks and drive-ins. One building has been completed, while the second building will be constructed for a specific tenant. The premises are suitable for warehousing, logistics, distribution, or light production.