Chomutov Jirkov

Ústí nad Labem
Planned
Price on request
Pronájem, Prodej
Minimal area
3 500 m²
Total area
21 410 m²
Planned area
21 410 m²
Public transport
Planned construction of two adjoining modern industrial halls totalling 11,960 sq m and 9,450 sq m. The buildings have been designed with a standard clear internal height of 10 m. The premises will be suitable for warehousing, logistics, distribution or light production. Construction will be carried out on a built-to-lease (or built-to-own) basis and according to the requirements of the future occupier. The smallest unit is 9,000 sq m. Handover of the completed premises is possible in 2022.
The park will be developed east of Jirkov and approximately 10 km north of Chomutov. Right next to the main road I/13 which connects Karlovy Vary, Chomutov, Most, Teplice and Ústí nad Labem. Easy access by public transport – bus stop within walking distance.
Planned construction of two adjoining modern industrial halls totalling 11,960 sq m and 9,450 sq m. The buildings have been designed with a standard clear internal height of 10 m. The premises will be suitable for warehousing, logistics, distribution or light production. Construction will be carried out on a built-to-lease (or built-to-own) basis and according to the requirements of the future occupier. The smallest unit is 9,000 sq m. Handover of the completed premises is possible in 2022.